Essential Power…Infinite Possibilities

October 28, 2004

Significant New Mineralization Discovered in Recent Drilling

Vancouver, B.C., October 28, 2004 Formation Capital Corporation (FCO-TSX) (the Company) is pleased to announce the most recently available results from the ongoing 25,000 foot drill program on its 100% owned Idaho Cobalt Project by its 100% owned subsidiary Formation Capital Corporation, U.S. The drill program is designed to develop additional reserves and resources along strike and down-dip on the Ram deposit. Drill holes will improve the knowledge of the ore zones and minimize development risk. Previously released drill results demonstrated an increase in the measured and indicated resource. The current results tabled below demonstrate a further increase in the resource. There are additional holes awaiting assays and several holes remain to be drilled.
Earlier in the 2004 drill program, the Company was successful in confirming the down dip extension of mineralization along 400 feet of a known 1600 feet of strike on sections 4+00N to 8+00N. This mineralization was encountered well below the previously defined vertical depth of 650 feet (table 2). The grade and width of this mineralization is consistent with that discovered in earlier drill programs.
In more recent drilling, the Company has concentrated its efforts on sections 2+00N, 0+00 and 8+00S. The mineralization encountered in the three drill holes on sections 2+00N and 0+00 continues to confirm the down dip extension of mineralization now evidenced along 600 feet of strike (table1). Further to the south three holes were drilled on a 400 foot step out on section 8+00S. All three holes encountered mineralization extending the strike length of the Ram deposit to approximately one half mile. The mineralization on this section, the furthest section drilled to the south, appears to increase in grade and width when compared to previous drill intercepts (table 1 and 2). Mineralization remains open along both north (N) and south (S) strike directions and at depth.
Click on Table Below to Enlarge

Click on thumbnail to View Location Plan of 2004 Drill Holes in PDF Format

To date the Company has received complete assay results for drill holes R04-01 through R04-8, R04-10, R04-15 and R04-17. The Company is awaiting completed assay results for drill holes R04-09, R04-14, R04-16 and R04-18. Drill Holes R04-02, R04-04, R04-06 and R04-11 were lost due to poor near surface ground conditions. To date, drill holes R04-01 through R04-23 have been completed totaling over 19,400 feet.
Mr. George King, B.Sc., P.Geo., is the Qualified Person working directly on the project. Drill core samples were sent to ALS Chemex Labs in Vancouver, B.C. for assay. A current list of drill holes, intersections and location map are available from the Company directly.
To ensure validity of results, Formation employs a regimented sampling procedure, including the submittal of different standard samples of known grade, blank samples and random duplicate samples to ensure results can be replicated. Further results will be released when available.
Formation Capital Corporation
“Mari-Ann Green”

Mari-Ann Green
C.E.O.

The statements contained in this news release in regard to Formation Capital Corporation that are not purely historical are forward-looking statements within the meaning of the Private Securities Litigation Reform Act of 1995, including Formation Capital Corporation’s beliefs, expectations, hopes or intentions regarding the future. All forward-looking statements are made as of the date hereof and are based on information available to the parties as of such date. It is important to note that actual outcome and the actual results could differ from those in such forward-looking statements. Factors that could cause actual results to differ materially include risks and uncertainties such as technological, legislative, corporate, commodity price and marketplace changes.
View the Previous News Release:
September 27th, 2004, Idaho Cobalt Project Drill Program Increases Resources
View the main News Releases page.
View the Next News Release:
December 3rd, 2004, EIS Schedule Set for Idaho Cobalt Project